
Golden Batch and Correlation Analytics
Two connected dashboards turn operational PI data into golden batch comparisons and clear evidence of the variables driving process performance.
Read more →IRELAND UNITED STATES INDIA
Pharmaceutical · Digital Transformation
A validated historian architecture connected production assets across three sites and created a shared foundation for real-time manufacturing insight.
Project profile
A validated historian architecture connected production assets across three sites and created a shared foundation for real-time manufacturing insight.
The organisation needed to replace fragmented data capture with a robust site historian that could connect a mixed estate of sophisticated systems, legacy PLCs and diverse interfaces. The architecture had to meet GxP expectations, support aggressive timelines across several geographies and remain ready for future integration with EBR systems.
Shutdown windows and validation milestones were tightly coordinated. Infrastructure delays and technical dependencies increased delivery risk, making detailed planning and cross-functional alignment essential.
Réalta used a three-phase model covering preparation, execution and validation. The core PI architecture was designed in a DEV environment with standardised global data models and templates. Controlled Software Design Specifications aligned the solution with the validation lifecycle from URS and SDS through IQ and OQ.
The team configured approximately 70,000 historian tags and developed advanced handling for UFL connectors and RDBMS sources. Custom parsing normalised unstructured feeds, while timestamp reconciliation and validation controls protected data integrity. Site-specific IOQ execution confirmed operation across DEV, VAL and PROD.
The programme defined requirements for at least 10 Power BI dashboards and 15 PI Vision displays. These gave process leaders structured access to equipment-level data and extended visibility from the shop floor to the desktop.
Historian analysis exposed inaccurate pressure transmitter readings that contributed to an overfill event. In another process, PI Vision and Power BI highlighted product-transfer discrepancies, helping the team improve jacket blowdown and fill monitoring procedures.
The rollout connected 185 assets through one validated historian platform across three sites. Teams can now analyse live and historical data more effectively, investigate root causes faster and make better plant-level decisions using evidence from actual operating trends.
Project view
Operational environments, applications and analytics that bring the work to life.
More results
Explore more work across automation, data, analytics and software.

Two connected dashboards turn operational PI data into golden batch comparisons and clear evidence of the variables driving process performance.
Read more →
A governed web application replaced a complex Excel process with controlled planning, monthly snapshots and real-time CapEx visibility across sites.
Read more →
An interactive scenario-planning application gives senior leaders a ten-year view of production, labour and regional demand across multiple sites.
Read more →
A production-ready AVEVA PI implementation brought five years of batch history, golden batch comparison and role-based access into one governed analytics environment.
Read more →
A validated historian architecture connected production assets across three sites and created a shared foundation for real-time manufacturing insight.
Read more →
A shutdown-critical PI System upgrade delivered on modern infrastructure with no data loss and full validation before production resumed.
Read more →Start the conversation
Talk to our team or take the Digital Maturity Assessment to understand where the greatest opportunities lie.