Golden Batch and Correlation Analytics
Two connected dashboards turn operational PI data into golden batch comparisons and clear evidence of the variables driving process performance.
Read more →IRELAND UNITED STATES INDIA
Pharmaceutical · Industrial Data Infrastructure
A shutdown-critical PI System upgrade delivered on modern infrastructure with no data loss and full validation before production resumed.
Project profile
A shutdown-critical PI System upgrade delivered on modern infrastructure with no data loss and full validation before production resumed.
The site’s PI System supported batch release through RtReports, but the platform was running on outdated software, hardware and operating systems. The complete upgrade had to fit within a two-week plant shutdown.
More than 50 OPC DA, RDBMS, FTBatch and other interfaces were feeding the system. Their configuration had to remain unchanged because even a small edit would trigger documentation updates and revalidation. Data also remained operationally important during the shutdown, so the plan had to protect every record while keeping unavailability below 24 hours.
Réalta used a multi-phase plan covering preparation, execution and validation. The team planned backwards from the shutdown, migrated legacy configuration documents in advance and created a detailed cutover schedule with contingency time and stakeholder approvals.
New servers were built with temporary identities, then assumed the original server names and IP addresses during cutover. Interfaces buffered data while the PI servers were offline and automatically recognised the replacement environment when it came online. This protected existing interface, display and application configurations.
Teams in Ireland and Canada extended execution coverage across time zones. A central communication hub coordinated daily activity, risk and validation decisions. The team verified interface buffering, restored the Data Archive and PIFD database, upgraded the software, checked every interface instance and confirmed that all buffered data reached the new system.
The Primary and Secondary Data Archives, AF Server, Event Frames Generator and RtReports Server were validated before the shutdown ended.
The project met the shutdown and validation deadlines with zero data loss. Data was unavailable for nine hours, well inside the 24-hour target. The site returned to production with a fully validated PI System running current software, hardware and operating systems.
Project view
Operational environments, applications and analytics that bring the work to life.
More results
Explore more work across automation, data, analytics and software.

Two connected dashboards turn operational PI data into golden batch comparisons and clear evidence of the variables driving process performance.
Read more →
A governed web application replaced a complex Excel process with controlled planning, monthly snapshots and real-time CapEx visibility across sites.
Read more →
An interactive scenario-planning application gives senior leaders a ten-year view of production, labour and regional demand across multiple sites.
Read more →
A production-ready AVEVA PI implementation brought five years of batch history, golden batch comparison and role-based access into one governed analytics environment.
Read more →
A validated historian architecture connected production assets across three sites and created a shared foundation for real-time manufacturing insight.
Read more →
A shutdown-critical PI System upgrade delivered on modern infrastructure with no data loss and full validation before production resumed.
Read more →Start the conversation
Talk to our team or take the Digital Maturity Assessment to understand where the greatest opportunities lie.